A topographic and tree survey was required for a 2.3km main arterial route in New South Wales, Australia, to upgrade the road and create paths and bike lanes. The survey needed to be conducted over 20 hectares without disruption to a busy flow of traffic. Using Hovermap, the entire scan was completed in just one day versus the 3 weeks it would have taken using a total station and GPS. Download the case study for the full details.