TWA JV wins $1.2bn HS2 contract for Birmingham depot project
The 30ha depot will include a maintenance building, carriage wash, inspection, train sidings for storage and a test track.
The 30ha depot will include a maintenance building, carriage wash, inspection, train sidings for storage and a test track.