Dallas Fort Worth International Airport (DFW) has appointed Jacobs to design modifications to the Skylink automated rail system in support of the planned expansion of Terminal F.
The project, which forms part of DFW’s plans to add up to 16 new gates at Terminal F, will require significant alterations to the existing Skylink guideway bridge spans.
Discover B2B Marketing That Performs
Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.
According to a company announcement, the design work will integrate complex bridge and structural engineering solutions while ensuring the automated train system continues to operate throughout construction.
With DFW handling more than 87 million passengers annually, maintaining Skylink’s operational continuity is seen as key to supporting ongoing passenger flows across multiple terminals.
Jacobs stated its design strategy would prioritise intelligent construction sequencing and operational safety, working closely with the Innovation Next+ construction joint venture (JV) to minimise disruption.
Jacobs executive vice-president Tom Meinhart said: “The project is about taking infrastructure that already works and finding smarter ways to adapt and extend it to support the airport’s next phase of growth.
“Keeping Skylink running throughout construction is no small task, and it speaks to our focus on thoughtful phasing, practical design and creative engineering that keeps people and commerce moving.”
As part of the project, modifications will also allow for the construction of dual parallel taxi lanes beneath the Skylink guideway.
This design aims to connect the new Terminal F facilities more effectively with the airport’s established taxiway network, extend the longevity of current infrastructure, and minimise impacts on airport operations.
DFW’s latest expansion comes as the airport responds to sustained regional growth in air travel and increasing pressure for additional capacity.
The Terminal F project is intended to unlock new operational capabilities and adapt infrastructure to future demands while maintaining passenger mobility during construction, the company said.
Earlier this month, DFW said it had lifted all six prefabricated modules for the new Terminal F Skylink Station into place, marking a construction milestone. The station is intended to connect the automated rail system with the future Terminal F.