STRABAG and ZÜBLIN have begun work on the first section of a replacement bridge over the Norderelbe in Hamburg, under a contract valued at approximately €150m ($164m).
The consortium, which also includes MCE, was commissioned by DEGES Deutsche Einheit Fernstraßenplanungs- und -bau.
Discover B2B Marketing That Performs
Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.
The official groundbreaking ceremony for the bridge work took place on 23 November.
According to STRABAG, the project involves constructing the first of two new bridge structures on the A1 motorway towards Bremen.
The existing Norderelbe Bridge requires rehabilitation, while the route carries up to 131,000 vehicles a day, including around 33,000 heavy goods vehicles.
The new cable-stayed bridge will be built alongside the existing crossing and measure approximately 380m. It will include facilities for pedestrians and cyclists.
STRABAG said that the first structure will have six lanes, comprising four traffic lanes and two weaving lanes, together with a hard shoulder.
Once opened, it will temporarily carry traffic in both directions, with three lanes in each direction, while the existing bridge is replaced and the second structure is built.
Completion of the first bridge is scheduled for 2030. Once both structures are finished, the crossing is expected to provide four lanes in each direction.
The bridge forms part of the widening of the A1 near the Norderelbe motorway interchange.
The A1 serves as a major north-south route in Germany and is a key corridor for commuters, businesses, and logistics operators in the Hamburg region.
STRABAG management board member Jörg Rösler said: “The Norderelbe Bridge forms part of one of Germany’s most important transport and logistics corridors and plays a vital role in European freight transport.
“The new bridge will lay the foundations for keeping this heavily used route operating efficiently in the future. Together, we are drawing on our extensive experience in complex bridge construction to deliver this technically challenging project efficiently while keeping traffic moving.”