Saint-Gobain Pipelines has won a $5M contract to supply 3000 tonnes of 30mm thick SG Iron tunnel linings to the Costain/Skanska/Bachy JV for use in the construction of cross passages on the UK’s Channel Tunnel Rail Link Section 2. The 3.5m – 4.5m diameter passages will link the 4.7km long, 7.1m diameter twin-tube tunnels on contract 240, between Stratford Box and Barrington Road. Manufacture and distribution of the linings is scheduled for the end of this year.
Discover B2B Marketing That Performs
Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.