
German construction company Züblin’s subsidiary ZÜBLIN Timber has received a contract from CFE Bouw Vlaanderen for BIM.5D design and timber construction at Gare Maritime in Brussels, Belgium.
The Gare Maritime project involves restoration of a former freight station covering nearly 45,000m².
Discover B2B Marketing That Performs
Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.
It comprises seven interconnected train sheds that Extensa Group transformed into an office, retail, restaurant and event complex.
Under the new €12m contract, ZÜBLIN Timber will construct 12 four-storey all-timber buildings with ribbed slabs on top of a supporting structure. Each building will feature a staircase in the centre.
The company plans to install 9,000m³ of wood, with 6,000m³ cross-laminated timber (CLT) and 3,000m³ of glued laminated timber (GLT) over ten months.
ZÜBLIN Timber project manager Martin Schimpf said: “Thanks to the innovative BIM-based design and planning methods, well-coordinated interfaces and modern products, we can easily deal with the task at hand.”

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataGare Maritime is expected to be a roofed village with retail, restaurants, businesses and public events space, as well as avenues, parks and squares. The structure will feature a controlled climate matched to the individual seasons.
Züblin has also won a separate construction contract from Carlsberg Byen for a building ensemble in Carlsberg, Copenhagen, Denmark.
This project will be built on a former brewery site in Valby district, covering 49,000m² of floor area. It is expected to be completed in 2021.
As part of the contract, Züblin will construct a second 80m Vogelius Tower block consisting of housing, offices and an underground car park across two connecting buildings – Kjeldahl House and Djørup House.
Carlsberg Byen also awarded the contract for the first tower, Dahlerup Tower, under this project to Züblin.