Goodman Group begins second stage of $1.5bn business park development in Japan

WCN Editorial Team 11 Apr 2016 ASIA BUILDINGS

Goodman Group has commenced the second stage of development of the $1.5bn Goodman Business Park in Chiba Newtown, Japan.

The logistics and business park is situated 25m above sea level and located inland on seismically stable land, which makes it less prone to  natural disasters.

When complete, the development will feature affordable logistics and commercial spaces, retail outlets, restaurants, café, child care service, free share bicycle service, dedicated bus services to the nearest train stations, wide estate roads ensuring congestion free access and left hand only turn for maximum safety.

The company has just completed work on Stage 1 (East Building) that feature a 116,000 sq m four-storey high specification multi-customer logistics facility, mostly pre-leased to leading Japanese 3PLs and retailers. Eco-friendly design includes roof top solar panels, LED lighting throughout and shared bicycle system.

Stage 2 (South Building) will have 125,000 sq m of multi-customer logistics space, four-stories with truck berths on all floors accessed by separate up and down ramps, flexible design and specification to meet customers' requirements including custom racking, material handling systems and cold/chilled storage, employee amenities and high voltage electricity.

The second stage of Goodman Business Park is slated to be completed by early 2018.

With 11 websites and newsletters covering all the key areas within the construction industry, World Construction Industry Network is the leading global construction information resource. READ ABOUT US
PRIVACY POLICY

STAY IN TOUCH!

LATEST TWEETS

World Construction Network | www.worldconstructionnetwork.com is a product of GlobalData. Copyright © 2020 GlobalData. All rights reserved.