Flatiron, AECOM selected for $215M road project in Colorado

WCN Editorial Team 12 May 2016 NORTH AMERICA TRANSPORT INFRASTRUCTURE

Flatiron Construction and AECOM have been provisionally selected by the Colorado Department of Transportation (CDoT) to design and construct the $215M C-470 Tolled Express Lanes Segment 1 project in the Denver metro area.


The CDoT named the companies as the ‘Apparent Selected Proposer’ for the 12-mile project, which will involve the addition of two tolled express lanes on westbound C-470 from I-25 to Colorado Boulevard, along with the reconstruction of part of the existing pavement.

It will include the addition of auxiliary lanes at selected locations, the replacement of bridges over the South Platte River and the widening of existing bridges throughout the project area.

The development will also involve safety and operational improvements along C-470 between I-25 and Quebec by adding direct-connect ramps and grade separations for the multi-use trail.

Flatiron will lead the fully integrated design and construction team, AECOM will provide construction and design services for the project expected to commence construction work in mid-2016. The lanes are set to be complete in early 2019.

* Data provided by Timetric's Construction Intelligence Center.

With 11 websites and newsletters covering all the key areas within the construction industry, World Construction Industry Network is the leading global construction information resource. READ ABOUT US
PRIVACY POLICY

STAY IN TOUCH!

LATEST TWEETS

World Construction Network | www.worldconstructionnetwork.com is a product of GlobalData. Copyright © 2020 GlobalData. All rights reserved.