
Enel Green Power Brasil Participações (EGPB) has begun construction on Cristalândia wind farm in Bahia, Brazil.
Located in the municipalities of Brumado, Rio de Contas and Dom Basilio, the $190m project will have a total installed capacity of 90MW, and is expected to commence operations in the second half of 2017.
Upon completion, the wind farm will produce over 350GWh annually, which is enough to power more than 170,000 Brazilian households. It will also reduce carbon emissions by about 118,000 tonnes.
The wind farm has been awarded to EGPB, a subsidiary of Enel, through the Leilão de Fontes Alternativas (LFA) — a public renewable energy auction — in April 2015.