Enel begins construction on $290M solar project in Minnesota

WCN Editorial Team 9 May 2016 NORTH AMERICA ENERGY & UTILITIES

Enel Green Power North America (EGPNA), a subsidiary of Enel, has begun construction on the $290M Aurora solar project in Minnesota.


Aurora will feature 16 PV plants with a total installed capacity of 150MWdc and will be able to generate more than 210m kWh per annum, which is equivalent to the energy consumption needs of over 17,000 US households. It will also eliminate over 150,000t of CO2 emissions into the atmosphere each year.

EGPNA’s CEO Rafael Gonzalez said: "The Aurora project marks a significant step forward in the growth of our solar portfolio

“By maximising the distributed solar model, Aurora highlights how innovation and design are driving the future of renewables, while providing communities with access to energy that delivers both the biggest possible environmental benefits and the most economic value.”

Construction work is set to create 400 jobs at its peak, and all 16 sites are expected to be operational by the end of 2016.

* Data provided by Timetric's Construction Intelligence Center.

 

With 11 websites and newsletters covering all the key areas within the construction industry, World Construction Industry Network is the leading global construction information resource. READ ABOUT US
PRIVACY POLICY

STAY IN TOUCH!

LATEST TWEETS

World Construction Network | www.worldconstructionnetwork.com is a product of GlobalData. Copyright © 2021 GlobalData. All rights reserved.